Recent content by DaveS

  1. D

    Project Space Shuttle Vessel

    When is improvements to GNC and APU/hydraulic systems planned for? Would like to have a fully working ADI and given that the APU/hydraulic system is by far the oldest system in SSV (it dates back to the original Space Shuttle Deluxe in 2007) I think it needs some attention.
  2. D

    Updates Blue Origin announces the New Glenn Orbital Launch Vehicle

    Plenty of those ideas through out the 80's and 90's. Only real success was McDonnell Douglas's DC-X:
  3. D

    Updates Blue Origin announces the New Glenn Orbital Launch Vehicle

    Maybe profit was never the reason, but the same schedule pressure was certainly there. Apollo 1, STS-51L and STS-107, they all had serious schedule pressure pushing them. Apollo 1 had the political pressure of beating the Soviets and landing on the Moon before the end of the decade. STS-51L was...
  4. D

    OHM New Global Textures and Night Lights [level 12 version]

    Noted major issue with these textures: They remove the high resolution tiles around the Cape Canaveral/Kennedy Space Center area. Screenshot provided.
  5. D

    Updates Blue Origin announces the New Glenn Orbital Launch Vehicle

    Better quality and a second vantage point:
  6. D

    Updates Blue Origin announces the New Glenn Orbital Launch Vehicle

    Customer, Amazon. Amazon LEO is Amazon's answer to SpaceX's Starlink satellite service.
  7. D

    Updates Blue Origin announces the New Glenn Orbital Launch Vehicle

    Video courtesy of Spaceflightnow.com:
  8. D

    Updates Blue Origin announces the New Glenn Orbital Launch Vehicle

    Well, New Glenn exploded on the pad tonight during the planned hot fire test. After an aborted attempt 2 hours earlier, the 7 BE-4 engines of the first stage (GS-1) ignited at 9 pm EDT (0100 UTC May 29) which was followed by the vehicle exploding, seeming taking its Transporter/Erector with it.
  9. D

    Project Space Shuttle Vessel

    While on the subject of payloads: How are you planning to to handle Spacelab? I just wonder because the Spacelab tunnel used its own custom bridge rail panels for the trunnion pins. Currently there's no way to specify this.
  10. D

    OHM New Global Textures and Night Lights [level 12 version]

    Looks real nice, here's ISS over central Europe, having just experienced an orbital sunrise:
  11. D

    Request Update Earth night light texture to latest NASA Black Marble version

    You can adjust the brightness of the nightlights on the Options tab. Default is 0.5 with a range between 0 and 1.
  12. D

    Project Space Shuttle Vessel

    No, just use the switch below the Digital Readout (DRO) to switch between MET and GMT.
  13. D

    Project Space Shuttle Vessel

    I don't think there is as the checklists are very good at calling out when to expect MA's as part of the procedure (see MPS ISOL and APU/HYD SHUTDN in the Ascent checklist). And none of the R4 switches are implemented at all.
  14. D

    Project Space Shuttle Vessel

    So no Post-Insertion CONFIG GPCs FOR OPS 2?
  15. D

    Project Space Shuttle Vessel

    For on-orbit burns, you want the procedures outlined in the generic Orbit Ops checklist, page 9-2, ON-ORBIT OMS BURN. The Ascent checklist will tell you when it is time to head over to the mission's Post-Insertion checklist. Once the PI checklist is complete, all operations is governed by their...
Back
Top